St Barthelemy, French Caribbean, October 2009

October 2009 

ELSS Engineering Ltd are contracted by a New York based group of Architects for the complete M&E package for this project.

This is a private residence project with a total filtration water volume of 525m3. All systems are fully automated and require minimal hands-on operation. Automatic backwashing of the filters, adjustable flow control rates for the waterfall features and full data logging make for another well engineered solution from the ELSS team.